วันอังคารที่ 16 สิงหาคม พ.ศ. 2554

Time Lapse Construction of a dock Green Heron

Time Lapse and presentation of our latest project: a 200 foot dock structure and experience the basis that the platform is finished with a durable composite decking. Foundation (PRF poles and reinforced wooden frame) was the use of the green car. The old dock was removed and built the new platform, fully supported by the new platform. Green Heron Docks has developed the green machine and construction of the dock, it is possible to build a jetty at the bottom andflat areas and no structural damage. Green Heron Docks uses the green car, which SunDock foundation for building systems Dockrider. Contact: info@ilovemydock.com or 1-888-MY1-Dock



http://www.youtube.com/watch?v=RIFz7E89fQg&hl=en

Tags : Buy Cheap Jewelry Best and Cheap RV Parts Civil Engineering

ไม่มีความคิดเห็น:

แสดงความคิดเห็น